Energy costs are rising across Northern Ontario, and many facility managers are looking for practical ways to respond. HVAC systems are often the first place to look. After all, they consume a large share of a building’s energy, and when they’re outdated, they cost even more to run. At Bisschops Industries, we work with public institutions and industrial clients to improve system performance and reduce energy use. Below are three examples of HVAC Success Stories that show what’s possible with smart planning, custom solutions, and local expertise.
Long-Term Care Home in Sudbury Reduces HVAC Energy Use by 27%
This facility was operating with aging equipment and struggling with uneven temperatures. While the system still functioned, it was far from efficient. After completing a site evaluation, we installed a high-efficiency rooftop unit, redesigned ductwork, and added zoning controls.
Results:
- 27% reduction in HVAC energy consumption
- More even temperatures across resident areas
- Fewer service calls and lower overall maintenance
North Bay School Saves Energy and Improves Air Quality
This school needed better ventilation but couldn’t fund a full HVAC overhaul. Instead, we proposed a targeted retrofit using variable-speed equipment and CO₂-based demand-controlled ventilation.
Results:
- 18% energy savings in the first year
- Consistent air quality that meets provincial standards
- Eligibility for regional energy-efficiency rebates
Because this project met both operational and financial goals, the school board is planning to expand the model to other locations.
Industrial Plant Achieves ROI in Under Three Years
This Northern Ontario facility struggled with high heating costs and uneven airflow. Warm air remained trapped near the ceiling, forcing the system to work harder. To resolve this, we installed destratification fans and optimized the duct system for even heat distribution.
Results:
- $9,000 in annual heating savings
- ROI reached in less than three years
- Improved floor-level comfort for workers and equipment
This solution not only lowered costs but also improved working conditions.
Why These Projects Delivered Results
Each of these upgrades worked because the solutions were tailored to the space, budget, and climate. At Bisschops, we don’t take a one-size-fits-all approach. Instead, we look at the full picture and recommend options that balance efficiency, performance, and long-term savings.
Here’s what our process includes:
- On-site system evaluations with energy usage analysis
- Retrofit strategies designed around lifecycle value
- In-house custom fabrication for faster, better installations
- Ongoing service and support to help measure results over time
Because we understand the demands of Northern Ontario facilities, we know how to design HVAC systems that deliver real results, year after year.
Want to cut costs and create more of your own HVAC success stories?
Contact Bisschops today to learn how we can support your next upgrade.